Machinery Installation Vibration Isolation Noise Control
Projects & Solutions
News & Data Sheets
Catalogue
Request Form
Links
Sitemap
Home Page

 

Liquid Roc 300 - Grout Pouches
 


Concrete Temperature
Time
Over 80° F
10-15 min.
80° F to 68° F
15-20 min.
68° F to 58° F
20-30 min.
58 °F to 48° F
30-60 min.
48° F to 38° F
2 hrs.
38° F to 28° F
4 hrs.
28° F to 18° F
6 hrs.
Below
24 hrs.

  INSTRUCTIONS




Drill to correct size and depth using rotary-hammer.
Mix thoroughly in pouch until color is uniform.
Cut corner and fill hole 2/3 full.
Insert stud and turn slowly by hand.
       
  Concerns:


•Cannot be used in horizontal or overhead holes.
•Must be used within 20 minutes after mixing.
•6 month shelf life.
•Do not use excessive pressure or puncture pouch while mixing.
•Leave it undisturbed through prescribed curing time consistent with the
   on-site temperature.



Wilrep Ltd.
email: request@wilrep.com
Tel: (905)625-8944 Fax:(905)625-7142
Toll Free: 1-888-625-8944

Machinery Installation | Vibration Isolation | Noise Control | Projects & Solutions | News & Data Sheets | Catalogue | Request Form | Links | Site Map | Home